Special thanks to all people consulted who have helped OblinArk become a reality.

Tempest Stansfield Associates (UK)

Eur Ing Sid Tempest CEng. FWeldI. Cert.EWE  BEng(Hons) MIMechE
 

Cupel Solutions Ltd (UK)

Steve Walker
 

Ryan McGoldrick and Crash

Environment Agency

Keith Solts (FCRM Technical Manager), Paula Nickson (Carbon Reduction Manager), Mark Garford (Development and Flood Risk Engineer), Zulfiqar Ali (Planning Liaison Officer), Karen Wooster (Senior Planner / Account manager for hydro schemes), John Dawson (Measurements), Pete Turner (Fisheries Technical Officer), Erica Adamson (Fish Diversity), Brian Leigh.
 

British Waterways / Canal River Trust

Simon Cleaver (Commercial Manager),
Stuart McKenzie (Selby Harbour Master)
 

Leeds planning authority

Clive Saul (Principle Minerals Planner),
Rathmell Maxwell (Minerals, Waste and Contaminated Land)
 

UK Coal / Harworth Estates

Gary Owen (Development Manager)
 

MP

Yvette Cooper MP
 

GB-Oils

Norman Ruddock
 

Northern Power Grid

David Frankland
 

Wakefield County Council

Councillor Denise Jeffery
Andy Wallhead (Corporate Director for Regeneration and Economic Growth)
Mick McKigney (Business Manager, Economic Development Services)

 

Aire River Trust

Kevin Sunderland, Jerry Whaley, Stuart Jobbins, Mark Penny and others.
 

TC Fabrication Ripley Ltd (UK)

Craig Ball, Terry Ball
 

APEM Ltd (UK)

Dr Iain J Russon Ph.D.,M.Sc., B.Sc. (Hons) (Fisheries Scientist)
Dr. David Fraser B.Sc. (Hons)Principal Aquatic Ecologist
 

STM Power Transmission Ltd (UK)

Andrew Ralston
Wayne Patton
 

STM and GSM (Italy)

Giuseppe Cavazzoni
 

DVE Technologies ApS (Denmark)

Rasmus Pedersen
Thomas Nørholm
 

DPR Services Ltd (UK)

Richard Walker, Andy Lavery, Dale Morris
 

CRD Devices Ltd (UK)

Dave Robinson
 

Kirwin Air Conditioning Ltd

Terry Kirwin
 

Formation Plastics Leeds (UK)

Paul, Dave, Joanne, Lucy
 

GB Oils Ltd (UK)

Norman Ruddock
 

SKF Group

Hubie Piron (Regional Sales Manager)
 

Eco Polyurethane Systems Ltd

 

Local generation


Directly supporting the changing patterns of energy production.

There is a high potential world wide for implementation of localised power generation.






 

Safety


Safety is integral to the design.






 

Capacity

A 180kw Ark will save 600 tonnes of carbon production a year against coal generation.

Generating 1103760 kwh per year which supplies 230 avaerage houses with green electricity. (average annual consumption 4800 kwh)